Evaluasi Produktivitas Mesin Bor Pada Kegiatan Eksplorasi PT. Sumbawa Timur Mining Kabupaten Dompu Provinsi Nusa Tenggara Barat

Authors

  • M. Agusfian PENA INSTITUTE Author

Abstract

  1. Sumbawa Timur Mining (STM) is an Indonesian private company holding the 7th Generation Contract of Work (Work Contract). In exploratory drilling activities it is common for drill handlebars to break during drilling activities, thus causing the drilling time to affect the productivity of the drilling machine. The purpose of this research is to find out about drilling machine drilling, increasing production targets and inhibiting drilling machines. This study evaluates the productivity of drilling machines in exploration activities. The data is processed using Microsoft Excel to see the distribution time, the level of equipment availability, increasing production targets and productivity constraints. The results showed that the drill machine working hours were scheduled for 2 shifts, so the circulation time was 412.37 hours/month with the availability level of the drilling machine consisting of 68.73% mechanical availability, 74.70% physical availability, 74.17% availability usage, utilization of effective use of 55.41% and the average work efficiency is 68.25%. PT. East Sumbawa Mining in 1 hole of 1,400 meters. Drilling speed per minute is 0.03 m/minute and per hour is 1.8 m/hour. Meanwhile, drilling productivity in one month is 88.61%. From the drilling calculation, the inhibition time for affective working time is 187.63 hours/month. As for the things that can be done to minimize the delay time can be done by optimizing the delay time, so as to increase the productivity of the drilling machine.

 

Downloads

Published

2025-10-08

How to Cite

Evaluasi Produktivitas Mesin Bor Pada Kegiatan Eksplorasi PT. Sumbawa Timur Mining Kabupaten Dompu Provinsi Nusa Tenggara Barat. (2025). J-SILITA : Teknik Sipil, Lingkungan, & Tambang, 1(01), 33-42. https://ejournal.kabarmoe.com/index.php/j-silita/article/view/12